- Site Map
- Accessibility
- By-laws
- City Council
- City Staff Contacts
- City Services
- Building Division
- By-law Enforcement Division
- Chief Administrative Officer
- City Clerk
- Community Services
- Economic Development Division
- Engineering
- Fire & Emergency Services
- Human Resources
- Library
- Museum
- Operations
- Overholt Cemetery
- Planning Division
- Treasury
- Committees
- Customer Service
- Employment Opportunities
- Energy Conservation
- Financial Reporting
- Forms and Schedules
- Grants for Non-Profits
- Hours of Operation
- Lowering of Flags
- Mayor's Office
- Municipal Election 2018
- Orientation Manual
- Projects & Tenders
- Purchasing
- Strategic Planning
- Taxes
- Tax Rate Calculator - 2018
- Water
- Water Rate Calculator - 2018
PCOC Under Construction
July 15, 2016
July 20, 2016
August 5, 2016
September 13, 2016
September 27, 2016
Port Colborne Operations Centre
The City of Port Colborne maintenance operations are currently carried out at two locations: the Central Operations Facility at 11 King Street and Parks Division at the Port Colborne Arena at 52 West Side Road. In 2008, the City undertook a Study of the facilities and has determined that these facilities are undersized and will require upgrading in order to meet the current and future needs of the City.
As a result, in 2012, the City decided to design and develop a new Operations Centre, replacing the two existing facilities and centralizing the maintenance operations (Parks Department and Public Works yards) at a new location. This new Operations Centre will be the most cost effective solution to serve the City and the community better with ongoing operation maintenance.
In August 2015, the Corporation of the City of Port Colborne and PRISM Partners Inc. invited submissions from qualified, professional Contractors to complete the construction of a new Operations Centre located at “The Island” just North of the existing Fire Station (No.3 KILLALY Street West) at the intersection of MELLANBY Avenue (Regional Road 3A) and KILLALY Street West (Regional Road 5) in the City of Port Colborne, Ontario. The Pre-Qualification closed in September 2015 and were reviewed to select 7 contractors to bid on the tender for the Operations Centre.
The detailed design of the facility including tender documents were finalized in early March 2016. The documents were released to the seven (7) pre-qualified General Contractors on March 15, 2016 and the tender closed on April 19, 2016.
The Base Bid pricing of tender submissions included for all construction and re-instatements related to the Operations Centre project including the Engineering Area (formerly referred to as “shell out” expansion) not including the finishing work for the Interior of the Engineering Area. The tender submissions were reviewed by the City’s Consultants, PRISM and they prepared a Recommendation Letter recommending an award to the low-bidder, JR Certus Construction Co. Ltd.
The tender pricing submitted by JR Certus Construction Co. Ltd. was found to be complete in all aspects, with regard to specifications, details and format. The proposed duration of the project as submitted by JR Certus Construction Co. Ltd. also meets the expected timelines proposed by the City’s consultants for the construction of the Operations Centre.
In following the recommendation of PRISM, Staff recommended that Council accept the lowest priced tender as submitted by JR Certus Construction Co. Ltd. of $10,115,000.00 for Project #2016-12, to allow the City to enter into an agreement with JR Certus Construction Co. Ltd. and to initiate construction as soon as possible.
On May 9, 2016 Council of the City of Port Colborne awarded the Operations Centre Construction to JR Certus Construction Co. Ltd.
The Operations Centre is expected to be constructed by the summer of 2017. The City’s Engineering Department will also be moving into the new Facility to accompany the Roads, Parks and Utilities Divisions of Operations.
Below are renderings prepared by the Architect depicting the design of the Operations Centre:
Please direct any inquiries about this project may be directed to Jim Huppunen A.Sc.T. at the project e-mail address: pcoc@portcolborne.ca
Report 2017-58 Telephone System Equipment Award
Report 2017-48 Renewable Passive Energy Generation for PCOC
Report 2017-8 Information Report Barrier Free Design Request
Report 2016-109 PCOC Project Budget Update September 12, 2016
Report 2016-80 PCOC General Contractor Award
Report 2016-10 Accessible Design Update
Report 2015-226 PCOC Estimated Costs Update (Class B)
Report 2015-177 PCOC Design Update
Report 2015-62 Preliminary Design Update
Report 2014-62 Zoning By-Law Amendment
Report 2014-53 Public Meeting Report for Zoning By-Law Amendment
Report 2014-21 PCOC Environmental Assessment Status Update
Notice of Completion September 2014
Environmental Study Report August 2014
PIC 3 Presentation May 12, 2014
PIC 2 Presentation March 10, 2014
PIC 1 Presentation January 13, 2014
Notice of Commencement Nov 2013
Report 2013-34 PCOC Status Update
Report 2013-06 PCOC Cost Consultant Surveyor Geotech Award
Report 2013-02 2013 Financing for 2012 Capital Projects
Report 2012-38 PCOC Architect Award
Report 2012-26 PCOC Project Manager Award
Report 2012-13 Information Report Re:Detailed Design
Report 2008-52 Works Yard Environmental Assessment
Prequalification of Contractors
Request for Prequalification of General Contractor – The City of Port Colborne Operations Centre
The Corporation of the City of Port Colborne and PRISM Partners Inc. are inviting submissions from qualified, professional Contractors to complete the construction of a new Operations Centre located at “The Island” just North of the existing Fire Station (No.3 KILLALY Street West) at the intersection of MELLANBY Avenue (Regional Road 3A) and KILLALY Street West (Regional Road 5) in the City of Port Colborne, Ontario.
The City has authorized staff to begin the design and development of a new Operations Centre that will replace its existing facilities. This project is for an Operations Centre that will serve Public Works, Parks, and Utilities departments. The facility is approximately 3981 m2 and comprises of three main structures, two of which will house the administrative staff and related support spaces, stores, mechanic bays, along with large and small truck storage. The third building is a “salt dome” that will serve the roads department with salt & sand/salt mix.
2015-23 Expression of Interest for Prequalification of Contractors
August 2016
Engineering & Operations Centre – Construction Continues!
The construction of the Engineering & Operations Centre has been progressing very well since the start in May of 2016. Below is a quick summary of the work completed to date:
· Earthworks is ongoing. Stripping of topsoil is complete;
· Foundation for the Wash Bay are complete, Administrative Building and Salt/Sand Building are nearing completion;
· Underground services are underway;
· Structural steel erection is planned to commence in September.
The project is on budget and ahead of schedule as the Contractor is pushing to have the buildings enclosed prior to the winter season.
2012 Archive
The City's Works Yard is no longer deemed to be adequate for the present operations and Council has agreed that the feasibility of a new facility be investigated, through presentations made at Strategic Planning and budget deliberations. Presently Philips Engineering Limited has completed an Environmental Assessment Study for a new Port Colborne Operations Centre. The Environmental Assessment recommended that a new facility be constructed in the Stonebridge Drive - Port Colborne Industrial Park site. Currently City Council is reviewing the feasibility of constructing a new site and is investigating funding opportunities.
New Operations Centre Notice of Study Commencement and Public Information Centre No. 1
New Operations Centre Notice of Study Commencement and Public Information Centre No. 2
New Operations Centre Notice of Study Commencement and Public Information Centre No. 3
New Operations Centre Port Colborne - Public Information Centre No. 3 Slideshow